A new global analysis reported by energy-storage.news found that annual battery energy storage system failures per deployed GWh declined by 98% between 2018 and 2025. The result was measured against a period in which installed BESS capacity grew exponentially, linking improved normalised failure performance with large-scale deployment. For battery buyers, the finding provides a system-level benchmark for evaluating supplier reliability claims across a much larger operating base, although the summary does not provide the underlying dataset, failure definition or technical root-cause analysis.
Research Advance
The analysis tracks annual BESS failures normalised by deployed energy capacity rather than reporting raw failure counts. That distinction is important: raw incident totals could have risen while the number of failures per GWh fell, because the installed fleet expanded rapidly. On the reported measure, however, the global fleet moved from 2018 to 2025 with a 98% reduction in failures per deployed GWh.
This provides evidence of improving operational reliability at the system level. It also shifts the assessment beyond individual cell specifications, which alone cannot determine whether a commercial storage asset will remain available. Battery management, thermal control, power conversion, commissioning and site operations all contribute to the number of failures observed per unit of deployed storage capacity.
The summary does not disclose how a “failure” was classified, which BESS chemistries or markets were included, or whether events were weighted by severity and duration. It also does not identify which design or operating changes were responsible for the decline. Consequently, the 98% figure should be treated as a headline trend rather than a direct guarantee for a new project or chemistry. The accompanying observation that installed capacity grew exponentially underscores the scale of the deployment base, but it does not by itself prove that all technologies, integrators or operating environments achieved the same improvement.
For procurement teams, the most useful implication is the need to compare failure metrics on a normalised basis. A supplier’s absolute incident history can be less informative than incidents per deployed GWh, provided that event definitions and reporting thresholds are consistent. The analysis also indicates that reliability has become a central measure of BESS maturity as the market moves toward substantially greater deployment.
Insights for Buyers
The 98% decline supports including fleet-normalised failure performance in supplier scorecards and requests for proposal evaluations. Buyers should ask for failures per deployed GWh, alongside information on incident severity, corrective action and whether calculations are based on installed capacity, operating time or delivered energy.
The finding should not remove the need for project-specific qualification. Cell chemistry, system architecture, climate, duty cycle and maintenance strategy can still affect outcomes, and the summary provides no evidence that the observed global trend applies equally to every configuration. It also does not establish a product-launch or technology-transfer timeline; the analysis ends with 2025 operating data.
For new cell or pack suppliers, this creates an opportunity to demonstrate reliability as a measurable commercial advantage. Validation packages should connect cell- and pack-level test results with field data, defined failure criteria and transparent normalisation. A credible supplier should be able to distinguish supplier-attributed failures from commissioning issues, integration defects, grid events and operational errors.
Questions for Suppliers
- How do you calculate failures per deployed GWh, and which events qualify as failures?
- Can you provide comparable field data for our target chemistry, climate and duty cycle?
- Which design and operating changes produced the largest reduction in field failures?
Source: energy-storage.news — https://www.energy-storage.news/global-bess-failure-rates-declined-98-between-2018-and-2025/

